EPT-HET2 PFM / EPT-HET1 FM

 

After the failure during the EPT-HET PQM vibration tests, it was decided that EPT-HET2 would follow a PFM approach which means applying the qualification levels with acceptance duration for the vibration and thermal cycling tests. Since both EPT-HET1&2 are identical units, EPT-HET1 followed an FM approach.

 

 

(1) The vibration tests on EPT-HET2 PFM were performed successfully from 15th to 18th of March 2016. The vibration tests on EPT-HET1 FM were performed successfully from 6th to 8th of April 2016.

 

The vibration tests on EPT-HET2results of the vibration tests

 

 

(2) The thermal cycling tests on EPT-HET2 PFM were performed successfully from 22nd to 31th of March 2016. The thermal cycling tests on EPT-HET1 FM were performed successfully from 11th to 21th of April 2016.

The thermal cycling tests on EPT-HET2 PFMresults of the thermal cycling tests

 

 

(3) The acceptance EMC tests for both units were performed successfully from 18th of April 2016 to 20th of May 2016.